Skip to main content

Information
BUSINESS PARK OF EDESSA

χάρτης
Εικόνα
oroi-domisis
Building Regulations

GG 632Δ/9.10.1989

Εικόνα
VIOTECHNIKA-OIKOPEDA
Craft / Small-Scale Industrial Plots

  • Blocks 3, 8
  • Minimum Frontage: twenty (20) meters
  • Minimum Plot Area: one thousand (1,000) sq.m.
  • Maximum coverage percentage: 60% of the plot area
  • Plot Ratio / FAR: two point four (2.4)
  • Maximum Building Height: twenty (20) meters

Εικόνα
viomichanika-oikopeda
Industrial Plots

  • Blocks 1, 2, 5, 6, 7
  • Minimum Frontage: thirty (30) meters
  • Minimum Plot Area: two thousand (2,000) sq.m.
  • Maximum coverage percentage: 60% of the plot area
  • Plot Ratio / FAR: two (2)
  • Maximum Building Height: twenty-four (24) meters

Εικόνα
ypodomes
Infrastructure

  • Internal road network (2,87 km)
  • Water supply network
  • Stormwater drainage system (2,29 km)
  • Sewerage Network (3,04 km)

Εικόνα
YPIRESIES
Services

  • Road Network: YES
  • Water Supply Network: YES (INACTIVE)
  • Wastewater/Sewage Network: YES
  • Stormwater Drainage Network: YES
  • Firefighting Network: YES (INACTIVE)
  • Fire Station: NO
  • MKA (Waste Treatment Plant): YES (INACTIVE)
  • N.G. (Natural Gas): NO
  • Street Lighting Network: YES (active only at the entrance)
  • Administration Building: SMALL CABIN / HUT WITHIN THE TREATMENT PLANT (MKA)
  • Security: NO
  • Fiber Optics: NO
  • Fencing: NO
  • CCTV: NO
  • Medical Clinic: NO
  • Compensatory Benefits: NO

Εικόνα
ypodomes
Other Networks - Infrastructures

  • Wastewater Treatment Plant (WWTP)
  • Electricity supply
  • Telecommunications network
  • Street lighting

Εικόνα
sygkoinonies
Transport Network

  • National Road Network
  • Railway Service

Εικόνα
aeroplana
Airport Information

Εικόνα
limania
Port Information